Build a fully tailored, adaptable MES

Build your manufacturing execution system (MES) in Tier0. Connect order plans with shop-floor execution, work orders, quality, materials and energy. Adapt pages, fields, roles and workflows as your business changes.

Tier0 ยท MESInteractive demo ยท Sample data

Production dashboard

Planned output350 t
Completed197.9 t
Remaining output152.1 t

Select equipment to view its work order, Output uses the sample records supplied in the brief.

Tier0App / Build

Turn your ideas into applications

Build a factory MES to manage orders, scheduling, production, quality and energy use.

MES

Give your MES a business analysis agent built on UNS

What sets Tier0 apart: your MES and UNS Agent work with the same business objects. Ask in natural language, connect work orders, equipment, output and quality records, and get analysis with traceable sources to support daily decisions.

Active work order progress
ChatAnalysis cards
Current PM #1 and PM #2 How much have these work orders produced, How many tonnes remain?

Based on the work order records shown, PM #1 Completed 85.6 / 150 t, Remaining 64.4 t; PM #2 Completed 112.3 / 200 t, Remaining 87.7 t. Remaining quantity is planned minus actual output; Assessing delivery risk also requires the planned finish time.

View data sourcesFactory/Production/State/work_orders

Fields: Work order ID, Equipment, Plan, Actual output, Unit and record time. This page uses sample data from the supplied brief.

Active work order progressIllustrative analysis
Equipment / Work orderCompletedRemainingProgress
PM #1 / wo00185.6 t64.4 t57.1%
PM #2 / wo002112.3 t87.7 t56.1%

Interactive example, Not connected to live data or AI Query service.

Scheduled tasksSkills
Interaction preview ยท No query is sent

See what needs attention today

Production managers check which equipment is running, changing over or under maintenance, then compare order progress with the plan. Breaking OEE into availability, performance and quality helps teams decide which records to review next.

Planner

Do due dates match equipment capacity?

Production team

Are current work orders on track?

Quality and process teams

Which batches and parameters need review?

Connect orders, equipment and batches
with shared data context

Organize data by equipment ID, work order, batch and time. Tier0โ€™s Unified Namespace (UNS) gives production applications and the agent a shared set of business objects. Select data connections to match available site interfaces.

Equipment and meters

Process parameters, Output, Machine states and energy readings
PLC / Meters โ†’ OPC UA, Modbus or MQTT

Orders and shop-floor records

ERP Order โ†’ As needed API, Database or file interfaces
Confirm work order, Downtime and quality inspections โ†’ Application forms

Equipment ID + Work order ID + Batch ID + Time
Linked production progress, Process readings and inspection records โ†’
Unified Namespace Proposed business model
Factory / Production
Equipment / Production line

Metric / Process parameters Process parameters ยท Measured value ยท Unit ยท Time

Metric / Energy Electricity ยท Water ยท Steam ยท Reporting period

Status / Equipment Running ยท Changeover ยท Maintenance

Status / Work order

Work order ID ยท Equipment ยท Product ยท Status ยท Planned quantity ยท Actual quantity ยท Unit ยท Record time

Status / Quality batch

Batch ID ยท Work order ID ยท Inspection item ยท Result ยท Time

Actions / Production records

Confirm work order ยท Report output ยท Log downtime

Check materials before starting.
Track work orders during production.

Teams see current work orders, completed quantities and pending tasks on the production board. Compare available materials with requirements before starting. Resolve shortages, then confirm production according to your siteโ€™s rules.

Tier0 ยท MESInteractive demo ยท Sample data

Material readiness check

Work order wo003 ยท Sample

Material B Not ready, Resolve material shortages first.

Put process deviations
in the context of work orders and batches

Process engineers review equipment parameters against targets and trends to identify when deviations occurred. Configure exception records, owners and resolution steps around your workflow, linked to the relevant work order and quality batch.

Tier0 ยท MESInteractive demo ยท Sample data

Process parameter trend

Select a period to view its work order and quality batch.

Keep inspection results tied to each batch

Inspectors prioritize pending checks and record inspection items, measured values and decisions against product standards. Link results to batches, products and work orders so reviewers can see production records and disposition notes together.

Tier0 ยท MESInteractive demo ยท Sample data

Batch inspection and traceability

Select a batch to view production, Inspection and disposition records.

Analyze material and energy use
alongside production tasks

Organize material and energy records by work order, equipment or shift. Compare actual consumption with targets. For consumption per unit, use consumption and good output from the same reporting scope, distinguishing production, changeovers and downtime.

Tier0 ยท MESInteractive demo ยท Sample data

Consumption on a shared scope

Scope: This work order and shift; Consumption per unit = Consumption รท Good output in the same period. Illustrative values for this demo.

MES Original interface reference

STAY UP TO DATE WITH PRODUCT UPDATES, LEARNING RESOURCES, AND MORE.

STAY UP TO DATE WITH PRODUCT UPDATES, LEARNING RESOURCES, AND MORE.

STAY UP TO DATE WITH PRODUCT UPDATES, LEARNING RESOURCES, AND MORE.